Immingham Storage Co Ltd

Immingham East Terminal

IME-SIS1

Safety Instrument System Shutdown Conditions Proof Testing Procedure

Controlled Copy 2017 Proof Test

P & I Design Ltd

DOCUMENT NO: SI483018_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 09.04.14

Tel: + 44 (0)1642 617444

PAGE 11 OF 17

Fax: + 44 (0)1642 616447

Controlled Copy 20170704

www.pidesign.co.uk

7.1

Tank 561 As Found Functional Testing Continued…

Step

Method of Test

Acceptance Criteria

Pass (

)

Fail (x)

Initial

7.1.9

Release HS561 Tank 561 Isolation

Pushbutton.

FINAL ELEMENT valve

automatically reopens initiating

DIAGNOSTICS as detailed on

SI483012_SCH Sheet 1

Comment differences from SCH in

section 7.1.12.

Pass

7.1.10

Operations to initiate Terminal Shutdown

system.

Record method of test

Fire Alarm (Muster Test)

Correct FINAL ELEMENT valve

position and DIAGNOSTICS as

detailed on SI483012_SCH Sheet

2.

Comment differences from SCH in

section 7.1.12.

Pass

Time from test initiation to trip

activation <=2 seconds.

Comment failures in section 7.1.12

Pass

7.1.11

7.1.8

Operations to Reset Terminal Shutdown

system.

FINAL ELEMENT valve

automatically reopens initiating

DIAGNOSTICS as detailed on

SI483012_SCH Sheet 1

Comment differences from SCH in

section 7.1.12.

Pass

7.1.12

Comments/Defects/ Remedial Actions

Report ALL to System Keeper

No Critical Failures

No Failures

No Observations

Tested by

Position

Qualification

Sign

Date

D.B.Faulkner

Instrument

Engineer

ISA84 FSS

06.07.17

System Keeper Acknowledgement

(Note: Signature confirms System keeper is advised of Comments/Defects/Remedial Actions and will initiate

terminal procedures for rectification works and/or isolation of plant as required)

Accepted by

Position

Qualification

Sign

Date