Tank 561 As Found Functional Testing Continued…
Step
Method of Test
Acceptance Criteria
Pass (
)
Fail (x)
Initial
7.1.9
Release HS561 Tank 561 Isolation
Pushbutton.
FINAL ELEMENT valve
automatically reopens initiating
DIAGNOSTICS as detailed on
SI483012_SCH Sheet 1
Comment differences from SCH in
section 7.1.12.
Pass
7.1.10
Operations to initiate Terminal Shutdown
system.
Record method of test
Fire Alarm (Muster Test)
Correct FINAL ELEMENT valve
position and DIAGNOSTICS as
detailed on SI483012_SCH Sheet
2.
Comment differences from SCH in
section 7.1.12.
Pass
Time from test initiation to trip
activation <=2 seconds.
Comment failures in section 7.1.12
Pass
7.1.11
7.1.8
Operations to Reset Terminal Shutdown
system.
FINAL ELEMENT valve
automatically reopens initiating
DIAGNOSTICS as detailed on
SI483012_SCH Sheet 1
Comment differences from SCH in
section 7.1.12.
Pass
7.1.12
Comments/Defects/ Remedial Actions
–
Report ALL to System Keeper
No Critical Failures
No Failures
No Observations
Tested by
Position
Qualification
Sign
Date
D.B.Faulkner
Instrument
Engineer
ISA84 FSS
06.07.17
System Keeper Acknowledgement
(Note: Signature confirms System keeper is advised of Comments/Defects/Remedial Actions and will initiate
terminal procedures for rectification works and/or isolation of plant as required)
Accepted by
Position
Qualification
Sign
Date