THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY

2016

page 50

Projects and Markets

Prior Experience/Projects

Shell Gabon

Design, engineering and construction of five single level

modules and supervised installation at the onshore facility in

Gabon, Africa. The modules included offices and mess facilities.

CNR International Maintenance and Refurbishment

Framework contract for several maintenance jobs throughout

the last six years for CNR International. Several multidisciplinary

works done on Ninian South, North and Central and Tiffany.

Centrica Energy Maintenance and Refurbishment

Framework contract for several maintenance jobs throughout

the last four years for Centrica Energy. Several multidisciplinary

works done on AP1, DP3 and DP4 platforms.

Nexen Buzzard Additional Living Quarter

Design, engineering and construction of a 60-man additional

living quarter (ALQ). It was constructed as 18 separate modules

fully commissioned and installed offshore to reduce the need

for heavy lifting barges.

Talisman Montrose Additional Living Quarter

Design, engineering and construction of a 30-man ALQ,

constructed as 16 mini modules each weighing a maximum of

200 tonnes to meet the lifting capacity of the platform’s crane.

Everest Additional Living Quarter

Design, engineering and construction of a 24-man ALQ. The

project was completed from design to installation within

12 months.