![Show Menu](styles/mobile-menu.png)
![Page Background](./../common/page-substrates/page0058.png)
THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY
2016
page 58
Capabilities and Capacities – Muir of Ord
(Ross-shire Engineering)
Total Area (m²)
7,700 m
2
Fabrication Area Covered (m²)
4,700 m
2
Assembly and Erection Area (m²)
4,500 m
2
Cranage – Lifting Capacity and Hook
Height (Tonnes and Metres)
• 4 x 20 tonne overhead cranes, 8 metre hook height
• 2 x 15 tonne overhead cranes, 4.8 metre hook height
• 1 x 2 tonne crane, 3 metre hook height
• 1 x 5 tonne crane, 3.6 metre hook height
• 2 x 5 tonne crane, 4.8 metre hook height
Load-Out Capacity (Tonnes)
Not applicable
Minimum Water Depth (Metres)
Not applicable
Maximum Water Depth (Metres)
Not applicable
Dry-Dock Capability
Not applicable
Other e.g. Licences, Permissions,
Warehouse and Storage Size,
Engineering, Electrical and Joiners
Workshop Size
• Office to seat 150 personnel
• 500 m
2
covered stores area
• Machining, 3D design and build, hydraulics,
mechanical and electrical capability
Capabilities and Capacities – Aberdeen Cluster
(Isleburn & Caledonian Petroleum Services)
Total Area (m²)
• Bucksburn – 1,165 m
2
• Altens – 4,490 m
2
• Nord Centre – 4,000 m
2
• Dyce – 12,313 m
2
• Bridge of Don – 3,086 m
2
• Tullos – 5,310 m
2
Fabrication Area Covered (m²)
• Bucksburn – 564 m
2
• Altens – 1,944 m
2
• Nord Centre – 2,290 m
2
• Dyce – 5,244 m
2
• Bridge of Don – 1,840 m
2
• Tullos – 2,300 m
2
Assembly and Erection Area (m²)
• Bucksburn – 350 m
2
• Altens – 1,296 m
2
• Nord Centre – 1,600 m
2
, further 1,650 m
2
available
• Dyce – 3,770 m
2
• Bridge of Don – 400 m
2
• Tullos – 510 m
2