Norwegian Continental Shelf

Sixty-seven pipelines with a total length of 297 kilometres will be decommissioned from 2016 to 2025.

The majority are inter-field connectors that link fields to host facilities.

Ten kilometres of pipeline are to be decommissioned in 2016, with activity forecast to peak at over 100 kilometres

in 2022.

For many of the projects included in the survey, pipeline decommissioning lies outside the timeframe.

Figure 28: Forecast of Pipeline Decommissioning Activity on the Norwegian Continental Shelf

0

20

40

60

80

100

120

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Total Length (km)

Umbilicals

Other Pipelines

Trunklines

Source: Oil & Gas UK

Increased Uncertainty

in Forecasts

Pipeline Decommissioning

2016 to 2025

Pipeline Decommissioning

(Kilometres) 2016 to 2025

Total

67

297

Norwegian

North Sea

Umbilicals

5

28

Trunklines

39

45

Other pipelines

23

224

Norwegian Sea

No activity

No activity

Barents Sea

No activity

No activity

1

2

3

4

5

6

7

8

9