Technical Information (UGS)
Storage Facility
Depomures
Storage Facility Type
Depleted Field
Multiple-Cycle
No
Working Volume (mcm)
300.00
The capacity increment is planned to be implemented in 2 phases: 100 mcm in 2019 and 200 mcm with COD in 2022
PCI Details
PCI Benefits
Project aims at supplying directly or indirectly at least two Member States
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Schedule
Start Date
End Date
Pre-Feasibility
06/2004
Feasibility
06/2008
06/2009
FEED
06/2011
06/2012
Market Test
06/2016
Permitting
06/2012
06/2016
Supply Contracts
FID
11/2016
Construction
07/2015
01/2022
Commissioning
2019
2022
NDP and PCI Information
Part of NDP
No (As far as we are aware, currently there
is no comprehrensive system wide national
development plan, only one regarding the
gas transmission infrastructure put
together by the TSO. Nevertheless, the
operator submitted a 5-year investment
plan to Romanian NRA in 2015, which is
updated anually. )
NDP Number
Currently PCI
Yes (6.20.4)
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
Not Relevant
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 476 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
257