UGS Chiren Expansion
General Information
Promoter
Bulgartransgaz EAD
Operator
Bulgartransgaz EAD
Host Country
Bulgaria
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Sponsors
Bulgartransgaz EAD
100%
UGS-N-138
Project
Storage Facility
Non-FID
Update Date
26/05/2016
Non-Advanced
Description
Capacity increase of the only gas storage facility on the territory of Bulgaria in order to achieve larger gas volumes stored, increased gas reservoir
pressures and higher daily average injection and withdrawal flowrates. The project provides for the increase in the working gas volume up to 1 bcm
and increase in the injection and withdrawal rate up to 8 – 10 mcm/day.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
GMS Chiren
Bulgartransgaz EAD
2022
STcBGn
BGn
61.5 GWh/d
Bulgartransgaz EAD
2022
BGn
STcBGn
61.5 GWh/d
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 21 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
31