Strandzha (BG) / Malkoclar (TR)
Comment: Transmission between Bulgaria and Turkey via existing transmission system at IP
Malkoclar, New capacity increment from 4Q 2025 to the level of 1140 GWh/d.
Bulgartransgaz EAD
2025
BGg/BGT
TRe
570.0 GWh/d
Capacity Increments Variant(s) For Information Only
Variant : Eastring - BG-3
Low capacity scenario (low in direction N->S), starting at Negru-Voda IP at RO-BG border,
passing through BG using upgraded existing pipelines to Malkoclar IP at BG-TR border
Point
Operator
Year
From Gas System To Gas System Capacity
Eastring BG Domestic Point
Bulgartransgaz EAD
2021
BGn
BG/EAR
200.0 GWh/d
Comment: Connection of Eastring at Negru-Voda IP, with domestic market, Entry/Exit capacity
at domestic points may go up to the level of 200GWh/d if sum of all Exit capacities from
domestic system to adjacent networks (or vice versa) is able to reach this level.
Bulgartransgaz EAD
2021
BG/EAR
BGn
200.0 GWh/d
Comment: Connection of Eastring at Negru-Voda IP, with domestic market, Entry/Exit capacity
at domestic points may go up to the level of 200 GWh/d if sum of all Exit capacities from
domestic system to adjacent networks (or vice versa) is able to reach this level.
Malkoclar (TR) > Strandzha (BG)
Bulgartransgaz EAD
2021
TRi
BGg/BGT
570.0 GWh/d
Comment: Transmission between Eastring - Bulgaria and Turkey via existing IP Malkoclar, New
capacity increment from 4Q 2025 to the level of 1140 GWh/d.
Bulgartransgaz EAD
2025
TRi
BGg/BGT
570.0 GWh/d
Negru Voda II, III (RO) / Kardam (BG)
Bulgartransgaz EAD
2021
BGg/BGT
RO/TBP
342.0 GWh/d
Comment: Transmission via existing IP Negru-Voda with increase of capacity at level of 342
GWh/d, New capacity increment from 4Q 2025 to the level of 712 GWh/d. Exit means direction
RO->BG.
Bulgartransgaz EAD
2021
RO/TBP
BGg/BGT
570.0 GWh/d
Comment: Transmission via existing IP Negru-Voda with increase of capacity at level of 570
GWh/d, New capacity increment from 4Q 2023 to the level of 1140 GWh/d.
Bulgartransgaz EAD
2025
BGg/BGT
RO/TBP
712.0 GWh/d
Comment: Exit means direction RO->BG.
Bulgartransgaz EAD
2025
RO/TBP
BGg/BGT
570.0 GWh/d
Strandzha (BG) / Malkoclar (TR)
Bulgartransgaz EAD
2021
BGg/BGT
TRe
342.0 GWh/d
Comment: Transmission between Eastring - Bulgaria and Turkey via existing IP Malkoclar, New
capacity increment from 4Q 2023 to the level of 712 GWh/d. Exit means direction BG->TR.
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 50 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
27