PCI Benefits

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project, Project concerns investment in reverse flow capacity

General Criteria Fulfilled

No

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

The modernization, rehabilitation and expansion of the existing gas transmission infrastructure will guarantee secure and reliable natural gas

transmission, enhance the efficiency, reliability and flexibility of the transmission system and provide the required capacities and pressures. The

implementation of the activities planned will secure the technical capabilities for transmission of additional natural gas quantities through the

territory of the country, coming in through the existing and new entry and exit points, and opportunities for diversification of the directions of

transmission depending on the market interest.

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Gorni Bogrov - Novi Iskar

Conditional infrastructure required after the final investment

decision on the realization of IBS Stage 2 related to a capacity

increase of 1.8 to 3.2 bcm/y.

700

19

20

Lozenets-Nedyalsko

1,000

20

PF Beglej - VA Dermantsi - VA Batultsi - VA Kalugerovo

700

58

Valchi Dol - Preselka

700

23

Total

120

20

Schedule

Start Date

End Date

Pre-Feasibility

12/2016

Feasibility

08/2017

FEED

Market Test

05/2017

Permitting

11/2018

Supply Contracts

11/2018

FID

Construction

11/2020

Commissioning

2020

2020

NDP and PCI Information

Part of NDP

Yes (2016-2025 Ten-year network

development plan of BTG)

NDP Number

Section 5.5.

Currently PCI

Yes (6.8.2.)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Not Applicable

Considered Tariff Regime

Not Applicable

Applied for Exemption

Not Relevant

Exemption Granted

Not Relevant

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 30 of 620

Current TYNDP : TYNDP 2017 - Annex A

Southern Corridor GRIP 2017–2026 Annex B |

22