Interconnection Turkey-Bulgaria

General Information

Promoter

Bulgartransgaz EAD

Operator

Bulgartransgaz EAD

Host Country

Bulgaria

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

Bulgartransgaz EAD for the gas pipeline section

on the territory of Bulgaria

100%

TRA-N-140

Project

Pipeline including CS

Non-FID

Update Date

29/06/2016

Non-Advanced

Description

Construction of new onshore gas pipeline in the section between the village of Losenets and the Bulgarian-Turkish border in the region of the village

of Strandja in parallel to the existing transit gas pipeline of about 76 km length on Bulgarian territory, diameter of the pipe 700 mm and capacity of

about 3 bcm/y at operating pressure 64 bar. A compressor station Losenets – 2 near the existing compressor station in the region of the village of

Losenets is also envisaged to be built. The project, as part of the priority Southern Gas Corridor is crucial in terms of security and diversification of

the sources and routes of natural gas supply to/through Bulgaria and the region. Its implementation is directly related to achievement of the

conditions required for creation of a competitive gas market, increase of systems' flexibility and market integration.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Interconnector ITB (Turkey - Bulgaria) (BG>TR)

Bulgartransgaz EAD

2020

BGn

BG/ITB

97.0 GWh/d

Interconnector ITB (Turkey - Bulgaria) (TR>BG)

Bulgartransgaz EAD

2020

BG/ITB

BGn

97.0 GWh/d

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM