Expected Gas Sourcing
Algeria, Caspian Region, LNG (?), Southern gas corridor gas sources
Time Schedule
Grant Obtention Date
Delay Since Last TYNDP
yes
Delay Explanation
The project is under consideration.
PCI Details
PCI Benefits
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation
prior to the commissioning of the project, Project concerns investment in reverse flow capacity
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
A project for the construction of a gas pipeline (pipelines)
aiming at exp
Total
Schedule
Start Date
End Date
Pre-Feasibility
01/2017
Feasibility
FEED
Market Test
Permitting
Supply Contracts
FID
Construction
Commissioning
2018
2018
NDP and PCI Information
Part of NDP
Yes (2016-2025 Ten-year network
development plan of BTG)
NDP Number
Section 5 (5.1.3. )
Currently PCI
Yes (6.8.4.)
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
Not Relevant
Exemption Granted
Not Relevant
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 36 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |