Eastring - Bulgaria
TRA-N-654
Project
Pipeline including CS
Non-FID
Update Date
31/05/2016
Non-Advanced
Description
Project Description: Eastring-SK is subproject located in Slovakia/Ukraine and is essential part of the Eastring project, which connects IP Veľké
Kapušany at the SK-UA border, with a new entry IP at an external border of the EU on the territory of Bulgaria in the following routing options: −
from SK to RO − via UA, (exist. pipeline) − via HU, (new pipeline). − from RO to TR − Option A – new pipeline passing production & storage area and
continuing to IP Isaccea and to BG/TR border by utilizing existing RO-BG transit assets − Option B – new pipeline, passing 2 production & storage
areas and continuing to an external border of the EU on the territory of Bulgaria. The project would (i) secure supplies in case of RU disruption and
therefore it will increase gas SoS in the broader Central-South-East EU region, (ii) allow access to alternative gas sources for Central, Western &
Southern Europe and (iii) mean step towards EU single gas market.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Variant : Eastring - BG-2
High capacity scenario, starting at new IP at RO-BG border, passing through BG using new
pipeline to a new IP at BG-TR border
Point
Operator
Year
From Gas System To Gas System Capacity
Eastring BG Domestic Point
Bulgartransgaz EAD
2021
BGn
BG/EAR
200.0 GWh/d
Comment: Entry/Exit capacity at domestic points may go up to the level of 200 GWh/d if sum of
all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this
level.
Bulgartransgaz EAD
2021
BG/EAR
BGn
200.0 GWh/d
Comment: Entry/Exit capacity at domestic points may go up to the level of 200 GWh/d if sum of
all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this
level.
Eastring Cross-Border BG/EAR <> RO/EAR
Bulgartransgaz EAD
2021
BG/EAR
RO/EAR
570.0 GWh/d
Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of
1140 GWh/d.
Bulgartransgaz EAD
2021
RO/EAR
BG/EAR
570.0 GWh/d
Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of
1140 GWh/d.
Bulgartransgaz EAD
2025
BG/EAR
RO/EAR
570.0 GWh/d
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 47 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
24