Benefits
Main Driver
Market Demand
Main Driver Explanation
Benefit Description
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
M6 Interconnection Osp
The length is approximately 1.2 km.
250
1
Total
1
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
FEED
Market Test
Permitting
Supply Contracts
FID
Construction
Commissioning
2022
2022
NDP and PCI Information
Part of NDP
No (The project is not included in the
currently valid and confirmed NDP (2016-
2025), but it was included in the previous
one (2015-2024) and it will also be
included in the new one, which is in
preparation (TYNDP 2017-2026) and will
be confirmed by our regulator expectedly
in the next months. )
NDP Number
Currently PCI
No
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
No
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 516 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
303