Table of Contents Table of Contents
Previous Page  146-147 / 634 Next Page
Information
Show Menu
Previous Page 146-147 / 634 Next Page
Page Background

TOWN OF MORRISVILLE

7-10

TABLE 7-1

Areas of Potential Impacts to be Addressed by Permitting and Mitigation Programs

Environmental Resource

Potential

for SCI

Types of SCIs

Mitigation

Surface Water Resources PI

Water quality degradation; increase in

stormwater runoff and sedimentation

Alteration of natural hydrograph

(e.g., magnitude, timing, frequency,

duration, rate of change); lower and more

frequent low-flow conditions; alteration of

channel morphology

UDO

- Stormwater Programs

- Sanitary Sewer Installation – stream crossings with directional

borings

- Water Conservation

- Riparian Buffers and Floodplain Protection – no residential

development or fill in floodplain

Land Use Plans and open space preservation

Parks and Recreation Master Plan

Erosion and Sediment Control Program administered by Wake County

Groundwater Resources

LI

Possible reduction in groundwater inflow

that provides baseflow in streams and

supports aquatic life during droughts

Reduction in use for private drinking water;

potential to become contaminated

Land use planning

UDO

- Open Space Preservation

- Riparian Buffers and Floodplain Protection – allow for natural

infiltration

- Stormwater Programs, including promotion of LID

Water Conservation Programs

Forest Resources

PI

Conversion to other uses

Reduction in air quality; increase in near-

surface air temperature; habitat

fragmentation

Land Use Planning - encourage development in Town Center and

growth corridors, as well as tree and urban forest preservation

Parks and Recreation Master Plan

UDO

- Conservation/Buffer District – promotes preservation of forest

resources

- Open Space Preservation

Riparian Buffers and Floodplain Protection