Article 2: Administration

Section 2.5. Application-Specific Review Procedures

2.5.9. Floodplain Development Permit

Morrisville, NC

June 2013

Unified Development Ordinance - Public Hearing Draft

Page 2-57

3.

Complies with the Engineering Design and Construction Manual;

4.

Complies with all other applicable Town ordinances and state and federal laws;

5.

Complies with all requirements and conditions of approval of any prior development permits or

approvals.

2.5.9.

Floodplain Development Permit

96

A.

Applicability

1.

The procedure and standards in this subsection apply to the review of applications for a

Floodplain Development Permit, which shall be required before commencement of any

development activities within Floodplain Overlay (FO) districts.

2.

An application for a Floodplain Development Permit may be submitted and reviewed

concurrently with applications for Site Plan Approval, Construction Plan Approval, or Stormwater

Management Permit, Administrative Adjustment, or Alternative Equivalent Compliance.

B.

Floodplain Development Permit Procedure

Figure

2.5.9.B

and the following subsections identify those steps in the standard review procedure (see

Section 2.4) applicable to the review of a Floodplain Development Permit

application and note any specific variations of, or additions to, those review

steps.

1.

Application Submittal and Acceptance

The application shall be submitted and accepted, and may be

withdrawn, in accordance with Section 2.4.3, except that the

application shall include certificates of reference level elevations and

any proposed floodproofing. (See Section 5.6, Floodplain

Management.)

2.

Staff Review and Decision

The Planning Director shall review the application, allow revisions of the

application, and decide the application in accordance with Section

2.4.4. The decision shall be one of the following:

a.

Approval of the application as submitted;

b.

Approval of the application subject to conditions; or

c.

Denial of the application.

3.

Post-Decision Actions

The post-decision actions and limitations in Section 2.4.8 shall apply to

the application except as follows:

a.

Effect of Approval

A Floodplain Development Permit allows the approval of any

concurrently-reviewed applications for Site Plan Approval,

Construction Plan Approval, Stormwater Management Permit,

Administrative Adjustment, or Alternative Equivalent Compliance for

the same development. It also authorizes submittal of an

96

This carries forward the floodplain development permit review procedures in Section 26-67 of the Flood Damage Prevention

Ordinance in Chapter 26 of the Code of Ordinances., modifying them only to omit detailed submittal content requirements (which

go into the Administrative Manual) and fit wording to the format used for other development review procedures.

Floodplain

Development Permit

Town Council Review and

Decision

Scheduling and Notice of

Meeting

Staff Review and

Planning Director Decision

Application Submittal and

Acceptance

Pre-Application

Conference

Step is Applicable

Step is Not Applicable

Planning and Zoning

Board Review and

Recommendation

Figure 2.5.9.B