Unified Development Ordinance - Public Hearing Draft

Page 8-1

Article 8:

Performance and Maintenance

SECTION 8.1.

PERFORMANCE

8.1.1.

Review for Compliance

Unless otherwise provided in this article or in Article 7: Stormwater Management, review for compliance

with the standards of this article shall occur during review of an application for Major Subdivision Final

Plat Approval (Section 2.5.6.B), Minor Subdivision Approval (Section 2.5.6.D) or Construction Plan

Approval (Section 2.5.8), as appropriate.

8.1.2.

Phasing of Development

The phasing of development is allowed as part of Conceptual Master Plan Approval (Section 2.5.4) or Site

Plan Approval (Section 2.5.7) in accordance with the following standards.

A.

Phasing Criteria

Phasing of approved development shall be in keeping with an approved phasing plan that shows

phase boundaries and describes included development and improvements in accordance with the

following criteria:

1.

The numbering of phases shall be sequential and coincide with the order in which the different

development phases are proposed to be constructed.

2.

Each phase shall be designed to include all improvements and other aspects of development

necessary to meet all requirements of this Code and other applicable regulations, either as a

stand-alone development or in conjunction with completed and accepted phases of the same

development.

B.

Temporary Measures

A phasing plan may include installation of temporary measures as necessary to allow a particular

phase to meet the phasing criteria in subsection

A

above, provided authorization of the temporary

measures shall be valid for one year and be accompanied by the provision of a performance

guarantee and a maintenance guarantee for the temporary measures in accordance with Section

8.1.3, Performance Guarantees,

and

8.2.2, Maintenance Guarantees.

8.1.3.

Performance Guarantees

533

A.

General

A performance guarantee in accordance with the standards in this section shall be required in the

following circumstances:

1.

To ensure completion of public infrastructure improvements (e.g., roadways, bike lanes, curb and

gutter, sidewalks, bike paths, crosswalks, traffic signs and controls, street lights, fire lanes, bus

shelters and other transit facilities, greenway paths—but not public improvements provided in

accordance with Article 7: Stormwater Management) that are required as part of Construction

Plan Approval, but are not installed before application for a Major Subdivision Final Plat, Minor

Subdivision Plat, or Building Permit;

533

N.C.G.S. § 160A-372(c) expressly authorizes municipalities to require performance guarantees to ensure the successful

completion of improvements required for subdivisions. N.C.G.S. § 160A-383 includes a more general authorization for zoning

regulations to facilitate the efficient and adequate provision of public improvements. Performance guarantees have long been

used in local subdivision regulations to ensure completion of required public improvements in subdivisions before lots are platted

and developed, and are commonly used in local zoning regulations to ensure completion of required public improvements before

served buildings are occupied, as well as to ensure completion of required buffers, screening, and other landscaping before

associated buildings are occupied or within a defined time period after their occupancy.