![Show Menu](styles/mobile-menu.png)
![Page Background](./../common/page-substrates/page0121.jpg)
Draft Standards
•
AOAC will post the draft SMPR® for a 30 day
public comment period
•
AOAC CSO and Working Group Chair will
reconcile comments
–
Revise SMPR® if needed
–
Reconvene working group if needed
•
Documents a community’s
analytical method needs.
•
Very detailed description of the
Standard Methods Performance
Requirements (SMPRs)
analytical requirements.
•
Includes method acceptance
requirements.
•
Used to adopt AOAC Official
Methods by Expert Review
Panels.
Published as a standard
•
.