Part 3 : Potential Interferants Study
•
List of potential interferants that are likely to be
encountered in various Department of Defense
applications:
–
working group discussion .
–
Joint Biological Point Detection System Test and
Evaluation Master Plan (TEMP)
–
Joint Concept Test Plan for Whole System Live Agent
Testing.
i
i l i l
i l
i
–
Jo nt B o og ca Tact ca Detect on System TEMP.
–
Generation Diagnostic System TEMP.
•
One additional Potential Intereferent was identified after
the
Ad hoc
working group concluded its work: “sand”.
Organization of Potential Interferents Table
•
Grouped.
•
Additional information provided.
•
Potential Theater of Operations.