49

7

Action Items

Action Items

2009 2010 2011 2012 2013 2014-

2035

3.19 Initiate Process to Change the Name of Existing

Triangle Parkway to Southport Drive Extension (or

other suitable name).

There is an existing small

road named Triangle Parkway located off NC 54,

connecting to International Drive. In order to avoid

confusion by residents, visitors, emergency services,

and postal workers with the planned Triangle

Parkway between NC 540 and NC 147, the name of

the existing road should be changed. Plans call for it

to connect to Southport Drive, so it could be called

Southport Drive Extension.

Related Policies:

5E, 5F

Estimated Cost:

10 hours of staff time

Lead Agency(ies):

Morrisville Planning

Department in cooperation with Public

Safety departments, NCDOT and the U.S.

Postal Service

Year One Goals/Activities

: Notify business owners along the existing Triangle Parkway and any

vacant land owners of the proposed change. Follow the accepted process to change the name

through NCDOT and the U.S. Postal Service.

Year 2-5 Goals/Activities:

None

Performance Measures:

Complete name change as soon as practical, ideally before new Triangle

Parkway is constructed

3.20 Conduct Engineering Design Study for Church

Street Improvements.

Church Street faces a number

of complexities, such as a narrow and unclear

right-of-way through the Town Center, a planned

roundabout, and road realignment at the northern

end. A full engineering study should be conducted

to resolve some of these complications and create

a specific plan so that improvements can move

forward.

Related Policies:

2D, 3A-G

Estimated Cost:

$50,000 consulting fee +

60 hours of staff time

Lead Agency(ies):

Morrisville Planning and

Engineering Departments

Year One Goals/Activities

: Prepare RFP and scoping language; advertise; and retain consultant.

Conduct study and identify any specific actions that the Town needs to take in order to proceed

with making the planned improvements to Church Street.

Year 2-5 Goals/Activities:

None

Performance Measures:

Complete study and make progress on securing right-of-way and funding

to make improvements

3.21 Study and Coordinate NC 54 Improvements.

The

Major Thoroughfare through Morrisville. Addressing

traffic congestion on NC 54 is critical to the function

of the overall transportation network, but it is

important to maintain a small-town feel, especially

in the Town Center area. Long-term cross-sections

have been identified for NC 54 and are illustrated

on pages E-15 and E-16 in the Transportation Plan

appendices. Following are short-, medium- and long-

term actions necessary to achieve the proposed

improvements.

Related Policies

: 3A-F

Estimated Cost:

350 hours staff time +

100 hours staff time annually + $150,000

consulting fees

Lead Agency(ies):

Morrisville Planning and

Engineering Departments

Year One Goals/Activities:

Continue requesting 124’ right-of-way dedication from developers

along NC 54 and requiring developers to build laneage on their side along frontage (to equal

their half of 4-lane cross-section); begin planned intersection improvements at NC 54 and Aviation

Parkway/Morrisville-Carpenter Road; continue pursuing state funds for improvements including

grade separations; Initiate NC 54 Corridor Study - Phase 1 Phasing Study (to provide instructions

for staff and developers for improving the roadway along frontage properties; provide a more

detailed plan for how and when improvements should be made in different segments to provide

the most benefit to the town with the least interruption of capacity).

Year 2-5 Goals/Activities:

Complete planned improvements at NC 54 and Aviation Parkway/

Morrisville-Carpenter Road; consider improvements to other intersections along NC 54 to improve

flow after widening of Davis Drive has been completed; work to get project listed on the MTIP

and STIP; maintain and update maps tracking the amount of right-of-way the town controls along

NC 54 and set target dates for acquiring sufficient right-of-way; continue pursuing state funds for

improvements including grade separations; continue requesting 124’ right-of-way dedication from

developers along NC 54 and requiring developers to build laneage on their side along frontage

(to equal their half of 4-lane cross-section); Complete NC 54 Corridor Study - Phase 1 (described

above) and Phase 2 Preliminary Design; Evaluate whether to proceed with NC 54 Corridor Study -

Phase 3 Functional Design and NEPA (an additional $150,000 consultant fee).

Year 6-25 Goals/Activities:

Work with NCDOT and Town of Cary to plan and conduct

improvements to NC 54 as quickly as feasible, including additional intersection improvements,

widening as funds and right-of-way are acquired, and construction of grade separations as

funding is available.

Performance Measures:

Complete initial design for improvements and make progress on securing

right-of-way and funding to make improvements.