Table of Contents Table of Contents
Previous Page  64 / 96 Next Page
Information
Show Menu
Previous Page 64 / 96 Next Page
Page Background

64

Figure 4: 2014 Board-approved

budgets by programme (NOK)

proved/signed. MNOK 9.7 of the funding not contracted

is GEF “flow through funding” (no coverage of GA admin

costs). Fundraising budget is based on all prospects with

80% or higher probability.

Figure 5: 2014 funding by Not

contracted/Contracted (NOK)

GEF funding and other not contracted funding is a signifi-

cant part of the fundraising budget 2014 as figure 5 shows,

with totally MNOK 19.3 (58% of total external funding was

not contracted). GEF contracts of MNOK 12.8 are not ap-

11.3.1 Projected funding

Figure 4 below shows the Board-approved funding budg-

et of MNOK 57.9 for 2014, distributed by Programme

area. The budget includes MNOK 4.5 MoE core funding,

MNOK 20.0 MFA funding, MNOK 14.9 UNEP funding

and MNOK 18.5 other external funding.