Background Image
Previous Page  16 / 156 Next Page
Basic version Information
Show Menu
Previous Page 16 / 156 Next Page
Page Background

Industry News

www.read-tpt.com

14

S

eptember

2012

ThyssenKrupp modernises site

THYSSENKRUPP

Steel

Europe

has comprehensively modernised

the facilities at its Bochum site with

numerous measures to increase

equipment efficiency and further

improve the quality of its steel products.

Some of the investment went into

optimising the rolling process.

The improvements will enable the

company to meet customers’ exacting

requirements for flat products. The

cooling section has been upgraded to

a laminar-flow system.

The aim is to expand production

capacities for high-strength and ultra

high-strength steels. In the cold rolling

mill the continuous pickling line has

been upgraded to improve product

surface quality.

The latest investments are part of an

extensive modernisation programme

begun in 2007.

Since then, a new walking-beam

furnace and new edger have been

installed, and the roll cooling system

in the finishing mill as well as the zinc

kettle and laser welding machine in

the hot-dip galvanising line have been

replaced. In addition, work is being

carried out constantly to improve

the stock management system and

automate the hot-dip coating line.

In total, more than €140mn has been

invested to strengthen ThyssenKrupp

Steel Europe’s Bochum mill.

ThyssenKrupp Steel Europe AG

Germany

Website:

www.thyssenkrupp-steel-europe.com

Thyssenkrupp

has carried out

a substantial

modernisation

programme