Town Center Plan
January 2007
Summary Notes
Public Transportation,
Juanita Shearer-Swink, Project Manager – Architecture,
Triangle Transit Authority
x
TTA welcomes discussions about transit service needs
x
Northwest Cary station will be located behind the Park Place Shopping Center
x
TTA evaluates station locations and functional criteria (need 12-15 d.u./acre and 30-40
feet of right-of-way)
x
Morrisville Station is not a “scheduled station” at this time; EIS is needed and then a final
design
x
Once there is a record of decision by a town to support a station, there is a minimum of
six years before a working station with service is provided
x
Infill stations have to demonstrate rider ship benefits to warrant stopping the train.
Other Discussion Highlights
Planning & Zoning Board members (Harry Clew, Kathleen Gordon, John
Gretz, Ward Mercer, Peter Prichard & Catherine Willis) ; Planning
Director Ben Hitchings; Town Engineer Blake Mills; Parks & Recreation
Director Krista McGivern and Parks and Greenways Planner Steadman
Sugg
x
Impact of congestion on the desirability of a Town Center as a destination
x
Barrier of the railroad tracks
x
Right-in/Right-out on Page Street and Church Street
x
Potential of traffic circles
x
Church Street measuring 23 foot back-to-back with 60-foot right-of-way
x
A grid network of streets south of Street “E”
x
Parking along Town Hall Drive
x
Possibility of a pedestrian overpass at the train station or the main
intersection
x
Stormwater ponds and the effect on Page Street
x
Concerns about funding
x
Importance of preserving trees on Church Street
x
Walkable greenway route
x
Perseverance to follow up with concerned citizens
Town Center Planning Process
Meeting #2: Transportation,
Stormwater, and Utility Infrastructure
February 23, 2006, 7:00 – 9:00 PM
Appendix 1