Town Center Plan

January 2007

Summary Notes

Public Transportation,

Juanita Shearer-Swink, Project Manager – Architecture,

Triangle Transit Authority

x

TTA welcomes discussions about transit service needs

x

Northwest Cary station will be located behind the Park Place Shopping Center

x

TTA evaluates station locations and functional criteria (need 12-15 d.u./acre and 30-40

feet of right-of-way)

x

Morrisville Station is not a “scheduled station” at this time; EIS is needed and then a final

design

x

Once there is a record of decision by a town to support a station, there is a minimum of

six years before a working station with service is provided

x

Infill stations have to demonstrate rider ship benefits to warrant stopping the train.

Other Discussion Highlights

Planning & Zoning Board members (Harry Clew, Kathleen Gordon, John

Gretz, Ward Mercer, Peter Prichard & Catherine Willis) ; Planning

Director Ben Hitchings; Town Engineer Blake Mills; Parks & Recreation

Director Krista McGivern and Parks and Greenways Planner Steadman

Sugg

x

Impact of congestion on the desirability of a Town Center as a destination

x

Barrier of the railroad tracks

x

Right-in/Right-out on Page Street and Church Street

x

Potential of traffic circles

x

Church Street measuring 23 foot back-to-back with 60-foot right-of-way

x

A grid network of streets south of Street “E”

x

Parking along Town Hall Drive

x

Possibility of a pedestrian overpass at the train station or the main

intersection

x

Stormwater ponds and the effect on Page Street

x

Concerns about funding

x

Importance of preserving trees on Church Street

x

Walkable greenway route

x

Perseverance to follow up with concerned citizens

Town Center Planning Process

Meeting #2: Transportation,

Stormwater, and Utility Infrastructure

February 23, 2006, 7:00 – 9:00 PM

Appendix 1