Start Date:
~
Fini sh Date:
ilm
Hours:
o
Units:
Account:
I
~ I
---
Sav(!
6. Click
I
$,v,
The equipment and all of the information associated with it will display in the
Equ ipment
panel.
To add equipment that was provided by a contractor, fol low these steps:
1.
Check the box by the desired equipment from the
Equipment / Entity/Tasl<
panel.
2. In the
Contractor Equipment
panel, enter the details of the equipment.
3. Click
I
Save
I.
Qj
. (Sj
Contractor:
..:J
I±I
LJ
Contr.ctors
[do
Description:
Start Date:
~
End Date:
I@I
Hours:
0
Units:
Account:
I
H
Cost:
Save
- -- - ----
To delete equipment from the work order,
1.
Check the box to the left of the equipment record in the
Equipment
panel.
2. Click
I
De'", '.
Costs for the equipment are displayed in the
Details
panel of the default work order view.
1.
Click
r" work
ord~
to view the work order. The equipment costs will be displayed on the
Details
panel.
The Work Order ELM View
ELM
stands for Equipment, Labor, Materials, and is a way to quickly add eqUipment, labor, and material to a
work order. Before
ELM
can be used, the crews must be configured in Server.
NOTE:
Only the user who creates the crew will be able to view that crew.
Server AMS 2013 SPl End User Training Manual
Section 5: The Work Order a 103