Table of Contents Table of Contents
Previous Page  97 / 111 Next Page
Information
Show Menu
Previous Page 97 / 111 Next Page
Page Background

5HSRUWV DQG 'RFXPHQWDWLRQ

ƒ

AOAC staff or designee will capture the decisions and action items into an ERP

report.

ƒ

The draft report will be sent back to the ERP Chair whose responsibility it is to sign off

on the report once approved.

ƒ

The report is then distributed to the ERP.

ƒ

ERP is responsible for a drafting a written recommendation to the OMB for each

method at a maximum of two years following adoption as First Action OMA

ƒ

Approved methods from the ERP meetings are published in the OMA and in the

Journal of AOAC INTERNATIONAL

.

ƒ

Meeting overviews are published in the AOAC

Inside Laboratory Management

magazine.

SUMMARY OF

75$&7

RESPONSIBILITIES