TAR NC Implementation Document – Second Edition September 2017 |

163

CALENDAR YEAR 2017

Purple boxes:

The calendar year 2017 includes two

out of the three ADs of the TAR NC, namely: (1) 6 April

2017 (entry into force date, ‘AD 1’) for Chapter I ‘Gen-

eral provisions’, Chapter V ‘Pricing of bundled capaci-

ty and capacity at VIPs’, Chapter VII ‘Consultation re-

quirements’, Chapter IX ‘Incremental capacity’ and

Chapter X ‘Final and transitional provisions’; and (2)

1 October 2017 (explicitly mentioned in the TAR NC,

‘AD 2’) for Chapter VI ‘Clearing and payable price’ and

Chapter VIII ‘Publication requirements’.

Orange box:

Within 1 month as from AD 1, the TSOs

are obliged to send to the NRA the existing contracts

or information on capacity bookings eligible for grand-

fathering under the TAR NC, which foresee no change

of the level of capacity- and/or commodity-based

transmission tariffs, except for indexation, if any

(Article 35(3) of the TAR NC).

Blue box:

By 5 July 2017, ACER is obliged to make

available to TSOs and NRAs a template for the consul-

tation document per Article 26(1), after having

consulted ENTSOG (Article 26(5) of the TAR NC).

Grey boxes:

As explained in Part 1, Chapter VIII ‘Pub-

lication requirements’, AD 2 for the TAR NC Chapter

VIII ‘Publication requirements’ does not mean that the

tariffs will be published at this date

 1)

. The first compli-

ance with the obligation in the TAR NC Chapter VIII

‘Publication requirements’ will be for MSs with tariff

period January-December, for publication of the set of

information before the tariff period, on TSO/NRA web-

site, as decided by the NRA (Article 30 of the TAR

NC). Simultaneously, a link to such information will be

provided on ENTSOG’s TP and also, the flow-based

charge (if applied) and simulation of all the costs for

flowing 1 GWh/day/year will be published directly on

ENTSOG’s TP in a standardised table, for IPs only by

default. Tariffs will be derived following the ‘old’ RPM

as the requirement for the ‘new’ RPM is only applica-

ble as of AD 3 of 31 May 2019.

 1) See Part 1, Chapter VIII ‘Publication requirements’, ‘When to publish’,

‘Article 31 – Publication notice period’.

Figure 46:

General timeline for 2017

(ACER)

Art. 26: Deadline for template

for consultation document

for NRAs and TSOs

5 Jul 2017

(BG, CZ, DE, ES, FI, GR, HR, IT, LT, LU, NL,

PL, SI)

Art. 30: Publication of tariff infor-

mation before tariff period

(‘old’ tariffs)

Dec 2017

(TSOs)

Art. 36(2)(a): Deadline to send information

to ENTSOG on compliance with Chapter VIII

31 Dec 2017

(TSO/NRA)

Estimated deadline for the start of

development of the final consultation document

Late Dec 2017

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

(TSOs)

Art. 35(1): Deadline to send to

NRAs safeguarded existing contracts

or information on bookings

6 May 2017

Art. 38: APPLICATION DATE 2

1 Oct 2017

Art. 38: APPLICATION DATE 1

6 Apr 2017

2017

(AT, BE, DK, FR, GB, HU, IE, NIR, PT, RO,

SE, SK)

Art. 30 (early compliance):

Publication of revenue information for the

prevailing tariff period on TSO/NRA

website; publication of flow-based charge

for the current tariff period on

ENTSOG’s TP (+ TSO/NRA website)

Dec 2017

(ALL)

Art. 29 (early compliance):

Publication of reserve prices for the

prevailing gas year on ENTSOG’s TP

(+  TSO/NRA website)

Dec 2017