TAR NC Implementation Document – Second Edition September 2017

Part I SAME RPM FOR THE TWO TSOs IN DIFFERENT

ENTRY–EXIT SYSTEMS

Assumptions regarding technical and forecasted capacity bookings, as well as

allowed revenues, are given in the following table. The entry-exit split is calculated

with data on forecasted capacity bookings, with the same equality in the distribution

of entry and exit bookings for both TSOs, half capacity being booked in entry and

half in exit.

INPUT DATA

Technical cap. – GWh/h Forecast – GWh/h Allowed Revenue – m€ Entry/Exit Split: Entry Entry/Exit Split: Exit

TSO A

Entry A1

10

9

70m€

50%

50%

Entry A2

4

2

Exit Dom A3

11

10

Exit A4

3

1

TSO B

Entry B1

13

12

65m€

50%

50%

Exit Dom B2

3

3

Exit B3

10

9

Table 40:

Input data for networks before the merger

TSO A

TSO B

Exit B3

Exit A4

Entry A1

Entry A2

Exit Dom B2

Exit Dom A3

Situation before merging: each TSO has its own market area

Figure 65:

Map of networks before the merger

Entry B1