Document realized with version :
CURRENTREV.
forbidden.
APPROVEDBY.
CLIENT.
DRAWNBY.
CHECKEDBY.
DESCRIPTION.
Petro-Chem, Process & Food Industries Across theUK.
CHKD.
Flotech Performance Systems Ltd
REV.
Reproduction, use or disclosure to thirdpartieswithoutexpressauthority isstrictly
DRAWINGTITLE.
We reserve all rights in this documentand the informationcontained therein.
Fareham, Hampshire
Unit 2, Salterns Ind. Est.
EMAIL:
sales@flotechps.comSpecialist Multi-Discipline Engineering Services to the
PROJECTNAME.
Salterns Lane
N.T.S.
WEB:
www.flotechps.comTEL: +44 (0) 1329 284145
PROJECT#.
DRAWING#.
CLIENTAPPROVEDBY.
SCALE.
STATUS.
SIZE.
©FLOTECH PERFORMANCE SYSTEMS LTD 2015
DATE.
ORDER#.
DATE
of
SHEETS.
Electrical, Instrumentation & Mechanical Engineers.
CUSTOMERDRAWINGNUMBER
BY.
APP.
NOTES
PO16 0SU
1
2
3
4
5
10
9
8
7
6
5
4
3
2
1
SOLIDWORKS Electrical
2016.0.3.12
11
12
13
14
6
7
8
9
Vivergo Fuels Project
FPS100639
D
11
K E
R H
Changed to3Ph Power Supply
MD R H
21/04/2016
Initial Design
SKID A
PLC Drawing Extension N4
FPS100639
D
21/04/2016
INJECTION, BLENDING & PUMPING SYSTEM
17
14/07/2016
MD
C
A
K E
K E
R H MD
ForConstruction
06/05/2016
MD
K E
AsBuilt
B
R H
11
K E
21/04/2016
Start Pump 2
P1 I:00
B1
Stop Pump 2
P1 I:01
B2
COM:
B3
+VDC
B4
P1 O:00
B5
P1 O:01
B6
P1 I:02
A1
P1 I:03
A2
COM
A3
-24VDC
A4
P1 O:02
A5
P3 O:03
A6
N4
Allen-Bradley
820 I/O EXP'N MODULE
Micro 820 Controller 820 I/O EXP'N 2080-IQ4OB4
102
0VDC
0VDC
0VDC
FROM: 10-3 FROM: 10-6123
124
FROM: 08-5 FROM: 08-5SUPPLY FROM F2
SKID A Control Panel 9-CP62-04-51-1