Petro-Chem, Process & Food Industries Across theUK.
CHKD.
Flotech Performance Systems Ltd
REV.
Reproduction, use or disclosure to thirdpartieswithoutexpressauthority isstrictly
DRAWINGTITLE.
We reserve all rights in this documentand the informationcontained therein.
Fareham, Hampshire
Unit 2, Salterns Ind. Est.
EMAIL:
sales@flotechps.comSpecialist Multi-Discipline Engineering Services to the
PROJECTNAME.
Salterns Lane
N.T.S.
WEB:
www.flotechps.comTEL: +44 (0) 1329 284145
PROJECT#.
DRAWING#.
CLIENTAPPROVEDBY.
SCALE.
STATUS.
SIZE.
©FLOTECH PERFORMANCE SYSTEMS LTD 2015
DATE.
ORDER#.
DATE
of
SHEETS.
Electrical, Instrumentation & Mechanical Engineers.
CUSTOMERDRAWINGNUMBER
BY.
APP.
NOTES
PO16 0SU
1
2
3
4
5
10
9
8
7
6
5
4
3
2
1
SOLIDWORKS Electrical
2016.0.3.12
11
12
13
14
6
7
8
9
Vivergo Fuels Project
FPS100639
D
12
K E
R H
Changed to3Ph Power Supply
MD R H
21/04/2016
Initial Design
SKID A
External Signals to Site
FPS100639
D
21/04/2016
INJECTION, BLENDING & PUMPING SYSTEM
17
14/07/2016
MD
C
A
K E
K E
R H MD
ForConstruction
06/05/2016
MD
K E
AsBuilt
B
R H
12
K E
21/04/2016
1X2
RL 1
A1
A2Finder
38.51.7.024.0050
Site Pump Start
14 11
12
09-5-3
RL 1
902
901
902
902
C05-A\Pair 1-2
901
C05-A\Pair 1-1
SITE PUMP START FROM JB1
1X2
SKID A Control Panel 9-CP62-04-51-1
RL 2
09-4-6
14
11
12
904
RL 3
09-6-6
14
11
12
1X2
904
904
C05-A\Pair 2-2
903
C05-A\Pair 2-1
904
903
PUMP 1 OR 2 RUNNING TO JB1
RL 4
10-4-5
14
11
12
1X2
906
906
C05-A\Pair 3-2
905
C05-A\Pair 3-1
906
905
RL 5
10-6-5
14
11
12
1X2
908
908
C05-A\Pair 4-2
907
C05-A\Pair 4-1
908
907
RL 6
10-10-5
14
11
12
1X2
910
910
C05-A\Pair 5-2
909
C05-A\Pair 5-1
910
909
903
903
TANK LOW LEVEL TO JB1
TANK LOW LOW LEVEL TO JB1
TANK HIGH LEVEL TO JB1
FROM: 07-5 TO: 07-5 FROM: 07-6 TO: 07-6 FROM: 07-6 TO: 07-6 FROM: 07-6 TO: 07-6 FROM: 07-7 TO: 07-7E
1X2
SCN