Background Image
Previous Page  47 / 68 Next Page
Information
Show Menu
Previous Page 47 / 68 Next Page
Page Background

June 2015

MODERN MINING

45

MINING IN AFRICA

feature

more than double production

Left:

The Asanko Phase 1

site showing the 3 Mt/a CIL

plant under construction.

The Phase 1 plant platform

is designed to cater for the

Phase 2 expansion.

Below:

The Tailings Storage

Facility (TSF) will serve

both Phases 1 and 2 of the

Asanko project. Knight

Piesold was responsible for

the design of the facility,

which has an HDPE lining

(which can be seen here).