Small site with no Instrument Engineer.
∗
Change being implemented on part of their shutdown system.
∗
The design by a large engineering procurement contractor
(EPC).
∗
EPC supplied installation, commissioning and site acceptance
testing (SAT) documentation.
∗
Installation and implementation through a local based company.
∗
Local based company had very experienced supervisor, who
overseen the installation and commissioning.
∗
What could go wrong?
Project outline