![Show Menu](styles/mobile-menu.png)
![Page Background](./../common/page-substrates/page0374.jpg)
∗
Case study 2: Project 2
•
No on-site changes to a design should be undertaken without
a full review of the proposed change.
•
When decommissioned components are used a physical
review of the as built/left state must be ascertained before
adding these components to a design.
•
Case study 3:
•
Experience may not make one competent.
•
Competence is required for all life-cycle parts, disciplines and
companies.
•
Have and follow the quality plan, without exception.
Case study Summaries