Table of Contents Table of Contents
Previous Page  46 / 52 Next Page
Information
Show Menu
Previous Page 46 / 52 Next Page
Page Background

NCYC Regular Meeting Minutes

Page 8 of 10

I did talk to Yacht Thruster and verified the position of the installation vs. its function and

received an approval. So everything is a “go” with a target for underwater gear installation by

Sunday March 13

th

, if Mother Nature cooperates. The remainder can be installed after launch.

Fleet Captain – Chuck Stroh for Glenn Nixon