Simon Storage Ltd – Immingham East Terminal

Gasoline Import – Layers of Protection Analysis

P & I Design Ltd

DOCUMENT NO: SI057001_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: G DATE: 29.06.12

Tel: + 44 (0)1642 617444

PAGE 26 OF 34

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

Initiating Event 3

Cause

Description

Notes

No of

events/year

3

ATG Failure

(Sticks or reads

low). This can

happen during

import.

The most conservative allowable failure

data for an ATG (Not SIL rated) is a

frequency of not better than 1e

-5

/hr. Site

reliability data suggests a figure much

lower than this however this is not readily

verifiable. Manufacturer gives a MTBF (all

modes) of 53 years for ENRAF Gauges.

0.1

AND Enabling Event 1 The Tank has to be on fill and the total

proportion of the year when import to the

tank is ongoing. Probability = 2.11 x 10

-2

(see 5.3.1) This explicitly assumes that the

ATG has not failed at the start of import.

The ATG is monitored at the start of

import, thus the ATG not failed is

confirmed.

2.11 x 10

-2

Overall Frequency of Initiating Event :

(1 x 10

-1

) x (2.1 x 10

-2

)

= 2.1 x 10

-3

per year

Note 1:Reliability Data for ATG/BPCS

The LOPA uses an order of magnitude 0.1 PFD for the level and control system. This is the

maximum that can be taken for a non SIS system not designed to BS EN 61511. However,

there is a modern control system which has been designed with a significant amount of

diagnostics utilising modern process control instrumentation.