EXHIBIT “A” Attachment to Agreement No. 1213126J-000.620027, dated July 16, 2018 , by and between SPEARHEAD CONSTRUCTION LLC and Skanska Walsh Design-Build JV for Furnish and Install Building Framing and Partitions for Pedestrian Bridge B at LaGuardia Airport Central Terminal Building Replacement Project, New York, LaGuardia Airport Queens, New York .
07920 08113 08119 08141 08311 08711 08712 08713 09271 09290 10147 10260 10280 10410 10430
Joint Sealants
Hollow Metal Doors and Frames Stainless Steel Doors and Frames Flush Wood Doors Access Doors and Frames Door Hardware Sets Automatic Door Operators Glass Reinforced Gypsum Fabrications Door Hardware Fire Resistance Assembly Identification Wall and Door Protection Toilet, Bath and Laundry Accessories Emergency Access and Information Cabinets Emergency Aid Specialties Gypsum Board Assemblies
10433 10440
Defibrillator Cabinets
Fire Protection Specialties
5. Related Sections: The Work includes, but not be limited to:
Specification Section
Description
06160 06640 07424 07426 07429 07720 07953 07841 08400 08400 09300 09630 09910
Sheathing (Interior) Plastic Paneling Metal Plate Wall Panels Formed Metal Wall Panels Insulated Metal Wall Panels
Roof Specialties and Accessories Expansion Joint Cover Assemblies Penetration Firestopping Exterior Enclosure System Requirements Exterior Enclosure System Requirements APX A Wind Tiling Stone Facing Interior Painting
Supplemental Documents
6. The Subcontractor is responsible to examine all of the Documents listed in Exhibit B – Drawings & Sketches, Specifications, Addenda and Other Documents. All items related to the Work and indicated in these Documents are included in the Subcontract Amount, Schedule, execution plan, and management of the Work.
Exhibit A, Page 2 of 18
Scope of Work/Supply and Clarifications/Qualifications