Previous Page  369 / 431 Next Page
Information
Show Menu
Previous Page 369 / 431 Next Page
Page Background

SITE 10

Weekly Level, Velocity and Flow Hydrographs

2/24/2014 to 3/3/2014

City of Morgan Hill

Sanitary Sewer Flow Monitoring and I/I Study

0

2

4

6

8

10

12

Mon

Tue

Wed

Thu

Fri

Sat

Sun

Level (in)

Lev

0.0

0.5

1.0

1.5

2.0

2.5

Velocity (fps)

Vel

0.00

0.05

0.10

0.15

0.20

0.25

0.30

0.35

0.40

0.45

2/24

2/25

2/26

2/27

2/28

3/1

3/2

Flow (mgd)

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Rain (in/hr)

Rain

Flow

BLFlow

Total Weekly Rainfall: 3.89 inches

Avg Level: 2.97 in. Peak Level: 4.57 in. Min Level: 1.70 in.

Avg Velocity: 1.24 fps Peak Velocity: 1.75 fps Min Velocity: 0.71 fps

Avg Flow: 0.128 mgd Peak Flow: 0.306 mgd Min Flow: 0.033 mgd

Page S10 - 8

12-0248 AEG Morgan Hill FM and II Rpt.doc