SITE 10
Weekly Level, Velocity and Flow Hydrographs
3/3/2014 to 3/10/2014
City of Morgan Hill
Sanitary Sewer Flow Monitoring and I/I Study
0
2
4
6
8
10
12
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Level (in)
Lev
0.0
0.5
1.0
1.5
2.0
2.5
Velocity (fps)
Vel
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
3/3
3/4
3/5
3/6
3/7
3/8
3/9
Flow (mgd)
0.0
0.2
0.4
0.6
0.8
1.0
1.2
Rain (in/hr)
Rain
Flow
BLFlow
Total Weekly Rainfall: 0.15 inches
Avg Level: 2.95 in. Peak Level: 4.23 in. Min Level: 1.72 in.
Avg Velocity: 1.23 fps Peak Velocity: 1.69 fps Min Velocity: 0.69 fps
Avg Flow: 0.125 mgd Peak Flow: 0.255 mgd Min Flow: 0.031 mgd
Page S10 - 9
12-0248 AEG Morgan Hill FM and II Rpt.doc