InstMC FS2016 V1.3

Nicol Instrument Engineering Limited

Verification

Clarifies that planning shall be carried out

throughout the SIS safety life-cycle.

New requirements for when the verification

includes testing. Including:

Strategy for integration of application program and

hardware and field devices.

Scope that describes the test set-up, and what type of

test are to be performed.

Etc.

Modifications identified during testing now

require an impact analysis.