SIS change management

Safety planning required for the modification and

re-verification, and includes:

Works carried out in accordance with the planning.

FSA carried out.

Updating of all documentations affected.

An analysis is required of impact on functional

safety as a result of proposed decommissioning

activity, and this includes an update of the H&RA

to determine the scope of impact to the SIS

safety life cycle.

Documentation and authorization is required

prior to any modifications or decommissioning

activities.