Article 6: Riparian Buffers

Section 6.5. Riparian Buffer Development Review

6.5.1. Applicability

Morrisville, NC

June 23, 2017

Unified Development Ordinance

Page 6-5

If determining the origin of a stream, the determination shall use the latest version of the North

Carolina Division of Water Resources’ Identification Methods for the Origins of Intermittent and

Perennial Streams.

B.

Any disputes over on-site determinations shall be referred in writing to the Director of the North Carolina

Division of Water Resources and is subject to review as provided in Articles 3 and 4 of N.C.G.S 150B.

SECTION 6.5. RIPARIAN BUFFER DEVELOPMENT REVIEW

6.5.1.

Applicability

A.

Except as exempted in Section

6.2.2.B, Exemptions,

Riparian Buffer Development Review is required

before any development, or any other activity listed in Table

6.8, Uses and Activities Permitted in Riparian Buffers,

may be conducted within a riparian buffer.

B.

An application for Riparian Buffer Development Review may be submitted and reviewed concurrently

with applications for Conceptual Master Plan Approval, Site Plan Approval,

Construction Plan Approval, Floodplain Development Permit, Stormwater

Management Permit, Administrative Adjustment, or Alternative Equivalent

Compliance.

6.5.2.

Riparian Buffer Development Review Procedure

Figure

6.5

and the following subsections identify those steps in the standard

review procedure (se

e Section 2.4)

applicable to the review of a Riparian Buffer

Development Review application and note any specific variations of, or additions

to, those review steps.

A.

Pre-Application Conference

The applicant shall hold a pre-application conference with Town staff in

accordance with Sectio

n 2.4.2.

B.

Application Submittal and Acceptance

The application shall be submitted and accepted, and may be withdrawn, in

accordance with Section

2.4.3,

except that if the application proposes

development or activity that is allowable only with mitigation, the application

shall include a mitigation strategy.

C.

Staff Review and Decision

The Town Engineer shall review the application, allow revisions of the

application, and decide the application in accordance with Section

2.4.4,

subject to the following provisions:

The decision shall be one of the following:

a.

Determine that the proposed development or activity is permitted

without an Authorization Certificate (“Exempt”);

b.

Approve the proposed development or activity as allowable, as

submitted;

c.

Approve the proposed development or activity as allowable, subject to conditions;

d.

Approve the proposed development or activity as allowable with mitigation, as submitted;

e.

Approve the proposed development or activity as allowable with mitigation, subject to

conditions; or

Riparian Buffer

Development Review

Town Council Review and

Decision

Scheduling and Notice of

Meeting

Staff Review and Town

Engineer Decision

Application Submittal and

Acceptance

Pre-Application

Conference

Step is Applicable

Step is Not Applicable

Planning and Zoning

Board Review and

Recommendation

Figure 6.5.2