Article 2: Administration

Section 2.5. Application-Specific Review Procedures

2.5.20. Alternative Equivalent Compliance

Morrisville, NC

June 23, 2017

Unified Development Ordinance

Page 2-63

The Administrative Adjustment will not substantially interfere with the convenient and enjoyable use

of adjacent lands, and will not pose a danger to the public health or safety.

The Administrative Adjustment is consistent with the purpose of the zoning district where located

and with the Comprehensive Plan.

(Ord. No. 2014-051, 11/10/2014; Ord. No. 2015-047, 07/28/2015)

2.5.20.

Alternative Equivalent Compliance

A.

Purpose

To encourage creative and unique design, the Alternative Equivalent Compliance procedure allows

development to occur in a manner that meets the intent of this Ordinance, yet through an alternative

design that does not strictly adhere to the Ordinance’s design standards. This is not a general waiver of

regulations. Rather, the procedure authorizes a specific development plan for a particular site that

incorporates deviations from certain development design standards, but achieves the intent of the

standards from which a deviation is sought to the same or greater degree than what would result from

the strict application of the standards.

B.

Applicability

The procedure and standards in this subsection apply to the review of applications for an

Alternative Equivalent Compliance, which may be submitted and granted for the following

standards:

a.

Reductions to the required tree canopy retention percentage in

Section

5.4.4, Tree Canopy Retention,

by an amount between 50

percent and 75 percent (requests to reduce the required

percentage by more than 75 percent are prohibited);

b.

Section 5.8, Access and Circulation;

c.

Section 5.9, Building Configuration and Design;

d.

Section 5.10, Parking and Loading

e.

Section 5.12, Landscaping.

An application for an Alternative Equivalent Compliance may only be

submitted and reviewed concurrently with an application for a Special

Use Permit, Type 1 Subdivision Preliminary Plat Approval, Type 2

Subdivision Preliminary Plat Approval, Major Site Plan Approval,

Minor Site Plan Approval, or Construction Plan Approval. The

application for an Alternative Equivalent Compliance shall be

reviewed in accordance with subsection

C

below irrespective of

whether all the required review steps are required for the concurrently

reviewed application.

(Ord. No. 2016-001, 05/10/2016)

C.

Alternative Equivalent Compliance Procedure

Figure

2.5.20.C

and the following subsections identify those steps in the

standard review procedure (see

Section 2.4)

applicable to the review of

an Alternative Equivalent Compliance application and note any specific

variations of, or additions to, those review steps.

Pre-Application Conference

The applicant shall hold a pre-application conference with Town staff

in accordance with Section

2.4.2.

Alternative

Equivalent

Compliance

Town Council Review and

Decision

with quasi-judicial public

hearing

Scheduling and Notice of

Meetings

Staff Review and

Recommendation

with DRC review

Application Submittal and

Acceptance

Pre-Application

Conference

Step is Not Applicable

Planning and Zoning

Board Review and

Recommendation

with public comment session

Figure 2.5.20.C

Step is Applicable