Article 2: Administration

Section 2.5. Application-Specific Review Procedures

2.5.24. Right-of-Way Encroachment Agreement Approval

Morrisville, NC

June 23, 2017

Unified Development Ordinance

Page 2-73

a.

Approve the application as submitted;

b.

Approve the application subject to conditions;

c.

Deny the application; or

d.

Remand the application back to the Planning Director or Planning and Zoning Board for further

consideration. (This may require additional review fees.)

Post-Decision Actions

The post-decision actions and limitations in Section

2.4.8

shall apply to the application except as

follows:

a.

Effect of Approval

Right-of-Way Encroachment Agreement Approval authorizes submittal of an application for a

Building Permit to install or construct approved structures accessory to development on

adjoining property within a public street right-of-way maintained by the Town of Morrisville

b.

Expiration of Approval

Right-of-Way Encroachment Agreement Approval shall expire if the approved structures

accessory to development on adjoining property is not constructed or installed within six months

after the date of Right-of-Way Encroachment Agreement Approval.

c.

Minor Modifications Allowed

(1)

The applicant may request, and the Planning Director may approve, minor deviations from

the approved Right-of-Way Encroachment Agreement where the applicant demonstrates

that such deviations:

(A)

Do not affect the overall concept of the approved Right-of-Way Encroachment

Agreement;

(B)

Will not result in any maintenance costs for the Town;

(C)

Are necessitated by physical, construction, or installation difficulties; and

(D)

Are consistent with the Right-of-Way Encroachment Agreement Approval.

(2)

The request shall be in writing, include a detailed justification for the requested deviations,

and be accompanied by the appropriate revised bulleted drawings, as determined by

the Planning Director.

(3)

Any change from the approved Right-of-Way Encroachment Agreement other than those

authorized in subsection

(1)

above requires a new application for Right-of-Way

Encroachment Agreement Approval.

C.

Right-of-Way Encroachment Agreement Approval Review Standards

An application for Right-of-Way Encroachment Agreement Approval shall be approved only if the Town

Council determines that the structure accessory to development on adjoining property associated with

the Right-of-Way Encroachment Agreement:

Complies with applicable district standards in

Article 3: Zoning Districts,

and applicable use

standards in

Section 4.3, Accessory Uses and Structures;

Complies with all other applicable standards in this Ordinance;

Complies with the Engineering Design and Construction Manual;

Complies with all other applicable Town ordinances and state and federal laws; and