Article 2: Administration
Section 2.5. Application-Specific Review Procedures
2.5.25. Wireless Telecommunication Facilities
June 23, 2017
Morrisville, NC
Page 2-78
Unified Development Ordinance
(i)
Continue to comply with this Ordinance;
(ii)
Are necessary to comply with conditions of
approval;
(iii)
Comply with the policies set forth in the Town of
Morrisville Wireless Telecommunication Facilities
Master Plan; or
(iv)
Are consistent with the Special Use Permit
approval or any Town Council approval on which
the Special Use Permit approval was based.
Consistency means the changes would not
significantly alter the development’s general
function, form, intensity, character, demand on
public facilities, impact on adjacent properties, or
other characteristic from that indicated by the
Special Use Permit approval or any prior Town
Council approval on which it was based.
(B)
In any case, the following change from the Special Use
Permit for Wireless Telecommunication Facilities
approval on which it was based shall constitute a
major change requiring amendment of the Special Use
Permit in accordance with Sectio
n 2.4.8.D Modification or Amendment of Approval:(i)
A change in a condition of approval.
(ii)
A change in the height of the facility.
(iii)
A change in the size of the compound area.
(C)
Before determining whether a change is a minor
change or a major change, the Planning Director shall
review the record of the proceedings on the Special
Use Permit application and consider whether any
proposed modification would require evidentiary
support in addition to that on which approval of the
Special Use Permit application was based.
Major Site Plan
Figure
2.5.25.C.2and the following subsections identify those steps in the standard review
procedure (see
Section 2.4)applicable to the review of Wireless Telecommunication Facilities
application requiring a Major Site Plan and note any specific variations of, or additions to, those
review steps.
a.
Pre-Application Conference
The applicant shall hold a pre-application conference with Town staff in accordance with
Section
2.4.2.b.
Application Submittal and Acceptance
The application shall be submitted and accepted, and may be withdrawn, in accordance with
Section
2.4.3.Wireless
Telecommunication
Facilities Requiring a
Major Site Plan
Town Council Review and
Decision
Scheduling and Notice of
Meetings
Staff Review and
Recommendation
with DRC review
Application Submittal and
Acceptance
Pre-Application
Conference
Step is Applicable
Step is Not Applicable
Planning and Zoning
Board Review and
Recommendation
Figure 2.5.25.C.2