Article 2: Administration

Section 2.5. Application-Specific Review Procedures

2.5.25. Wireless Telecommunication Facilities

June 23, 2017

Morrisville, NC

Page 2-78

Unified Development Ordinance

(i)

Continue to comply with this Ordinance;

(ii)

Are necessary to comply with conditions of

approval;

(iii)

Comply with the policies set forth in the Town of

Morrisville Wireless Telecommunication Facilities

Master Plan; or

(iv)

Are consistent with the Special Use Permit

approval or any Town Council approval on which

the Special Use Permit approval was based.

Consistency means the changes would not

significantly alter the development’s general

function, form, intensity, character, demand on

public facilities, impact on adjacent properties, or

other characteristic from that indicated by the

Special Use Permit approval or any prior Town

Council approval on which it was based.

(B)

In any case, the following change from the Special Use

Permit for Wireless Telecommunication Facilities

approval on which it was based shall constitute a

major change requiring amendment of the Special Use

Permit in accordance with Sectio

n 2.4.8.D Modification or Amendment of Approval:

(i)

A change in a condition of approval.

(ii)

A change in the height of the facility.

(iii)

A change in the size of the compound area.

(C)

Before determining whether a change is a minor

change or a major change, the Planning Director shall

review the record of the proceedings on the Special

Use Permit application and consider whether any

proposed modification would require evidentiary

support in addition to that on which approval of the

Special Use Permit application was based.

Major Site Plan

Figure

2.5.25.C.2

and the following subsections identify those steps in the standard review

procedure (see

Section 2.4)

applicable to the review of Wireless Telecommunication Facilities

application requiring a Major Site Plan and note any specific variations of, or additions to, those

review steps.

a.

Pre-Application Conference

The applicant shall hold a pre-application conference with Town staff in accordance with

Section

2.4.2.

b.

Application Submittal and Acceptance

The application shall be submitted and accepted, and may be withdrawn, in accordance with

Section

2.4.3.

Wireless

Telecommunication

Facilities Requiring a

Major Site Plan

Town Council Review and

Decision

Scheduling and Notice of

Meetings

Staff Review and

Recommendation

with DRC review

Application Submittal and

Acceptance

Pre-Application

Conference

Step is Applicable

Step is Not Applicable

Planning and Zoning

Board Review and

Recommendation

Figure 2.5.25.C.2