Page Background

Article 2: Administration

Section 2.5. Application-Specific Review Procedures

2.5.25. Wireless Telecommunication Facilities

June 23, 2017

Morrisville, NC

Page 2-80

Unified Development Ordinance

(iv)

Are consistent with the Major Site Plan Approval.

Consistency means the changes would not

significantly alter the development’s general

function, form, intensity, character, demand on

public facilities, impact on adjacent properties, or

other characteristic from that indicated by the

Major Site Plan Approval.

(B)

In any case, the following changes from the Major Site

Plan Approval for Wireless Telecommunication

Facilities shall constitute a major change requiring

amendment of the Major Site Plan Approval in

accordance with Section

2.4.8.D Modification or Amendment of Approval:

(i)

A change in a condition of approval.

(ii)

A change in the height of the facility.

(iii)

A change in the size of the compound area.

Minor Site Plan

Figure

2.5.25.C.3

and the following subsections identify those steps in

the standard review procedure (see

Section 2.4)

applicable to the to

the review of Wireless Telecommunication Facilities application

requiring a Minor Site Plan, or additions to, those review steps.

a.

Pre-Application Conference

The applicant shall hold a pre-application conference with Town

staff in accordance with Section

2.4.2.

b.

Application Submittal and Acceptance

The application shall be submitted and accepted, and may be

withdrawn, in accordance with Section

2.4.3.

c.

Staff Review and Decision

The Planning Director shall review the application, allow revisions of the application, and

decide the application in accordance with Section

2.4.4

and Sectio

n 2.5.7.D.

The decision shall

be one of the following:

(1)

Approve the application as submitted;

(2)

Approve the application subject to conditions; or

(3)

Deny the application.

d.

Post-Decision Actions

The post-decision actions and limitations in Section

2.4.8

shall apply to the application except

as follows:

(1)

Effect of Approval

Minor Site Plan Approval for Wireless Telecommunication Facilities allows the approval

of any concurrently-reviewed applications for Construction Plan Approval, Floodplain

Management Permit, Stormwater Management Permit, Administrative Adjustment, or

Alternative Equivalent Compliance for the same development. It also authorizes submittal

of any other development applications that may be required before construction or use

of the development authorized by the Minor Site Plan Approval.

Wireless

Telecommunication

Facilities Requiring a

Minor Site Plan

Town Council Review and

Decision

Scheduling and Notice of

Meetings

Staff Review and

Planning Director Decision

with DRC review

Application Submittal and

Acceptance

Pre-Application

Conference

Step is Applicable

Step is Not Applicable

Planning and Zoning

Board Review and

Recommendation

Figure 2.5.25.C.3