Table of Contents Table of Contents
Previous Page  17 / 90 Next Page
Information
Show Menu
Previous Page 17 / 90 Next Page
Page Background

LOG of BORING

Project Name:

The Aberdeen

Project No.:

4754.002.16

Client:

Engineered Solutions of Georgia

Boring No.:

B-1

Location:

Vinings, Georgia

Date:

11/11/2016

Elevation

Description

Depth

Samples

Drilling Observations

Topsoil: 5"

(feet) No. Type DCP

Hand Auger Boring

No groundwater encountered

FILL: Rock-laden SILT,

at the time of drilling.

brown, black, some sand,

topsoil, dry to moist,

* DCP on rock fragments

non-plastic

1 DCP 13-13*

5.0

2 DCP 15+*

10.0

Note: Topsoil observed in drill

cuttings from approximately

10 to 15 feet.

3 DCP 15+*

15.0

FILL: Sandy SILT, stiff, tan,

brown, trace mica, dry,

non-plastic

4 DCP 7-11

20.0

5 DCP 6-10

LEGEND

SPT= Standard Penetration Test

25.0

SS = Split-Spoon (sample)

DCP = Dynamic Cone Penetrometer

Sandy SILT, red, brown,

GS= Ground Surface

trace mica, moist, low

TS = Top of Slab

plastic

HWR= Highly Weathered Rock

Boring Terminated @ 29'

PWR= Partially Weathered Rock

~1016 ft. MSL