LOG of BORING
Project Name:
The Aberdeen
Project No.:
4754.002.16
Client:
Engineered Solutions of Georgia
Boring No.:
B-3
Location:
Vinings, Georgia
Date:
11/11/2016
Elevation
Description
Depth
Samples
Drilling Observations
Concrete: 4.8"
(feet) No. Type DCP
Hand Auger Boring
GRAVEL
No groundwater encountered
at the time of drilling.
Note: 4-inch void present
Boring Terminated @ 2'
immediately underlying the
concrete slab-on-grade.
Boring terminated at 2 feet in
5.0
gravel.
10.0
15.0
20.0
LEGEND
SPT= Standard Penetration Test
25.0
SS = Split-Spoon (sample)
DCP = Dynamic Cone Penetrometer
GS= Ground Surface
TS = Top of Slab
HWR= Highly Weathered Rock
PWR= Partially Weathered Rock
~1025 ft. MSL