Table of Contents Table of Contents
Previous Page  24 / 90 Next Page
Information
Show Menu
Previous Page 24 / 90 Next Page
Page Background

LOG of BORING

Project Name:

The Aberdeen

Project No.:

4754.002.16

Client:

Engineered Solutions of Georgia

Boring No.:

B-8

Location:

Vinings, Georgia

Date:

11/11/2016

Elevation

Description

Depth

Samples

Drilling Observations

Topsoil: 5"

(feet) No. Type DCP

Hand Auger Boring

No groundwater encountered

FILL: SILT, soft to firm, tan,

1 DCP 4-3

at the time of drilling.

brown, some sand, trace

mica, rock fragments, very

2 DCP 13-12*

* DCP on rock fragments

moist, non-plastic

3 DCP 6-5

4 DCP 5-5

5.0

5 DCP 4-6

6 DCP 9-9*

7 DCP 11-10*

Note: Boring refused at 7.5

feet on rock fragments.

Hand Auger Refusal @ 7.5'

10.0

15.0

LEGEND

SPT= Standard Penetration Test

25.0

SS = Split-Spoon (sample)

DCP = Dynamic Cone Penetrometer

GS= Ground Surface

TS = Top of Slab

HWR= Highly Weathered Rock

PWR= Partially Weathered Rock

~1034.5 ft. MSL