Table of Contents Table of Contents
Previous Page  25 / 90 Next Page
Information
Show Menu
Previous Page 25 / 90 Next Page
Page Background

LOG of BORING

Project Name:

The Aberdeen

Project No.:

4754.002.16

Client:

Engineered Solutions of Georgia

Boring No.:

B-9

Location:

Vinings, Georgia

Date:

11/11/2016

Elevation

Description

Depth

Samples

Drilling Observations

Topsoil: 0"

(feet) No. Type DCP

Hand Auger Boring

FILL: Rock-laden SILT,

No groundwater encountered

brown, some sand, trace

at the time of drilling.

roots, dry to moist, non-plastic

5.0

FILL: Sandy SILT, soft to

10.0

firm, brown, trace to some

rock fragments, moist,

non-plastic

15.0

Boring Terminated @ 19'

20.0

LEGEND

SPT= Standard Penetration Test

25.0

SS = Split-Spoon (sample)

DCP = Dynamic Cone Penetrometer

GS= Ground Surface

TS = Top of Slab

HWR= Highly Weathered Rock

PWR= Partially Weathered Rock

~1032 ft. MSL