AR T I C L E

VisiConsult X-ray Systems & Solutions GmbH

www.read-tpt.com

MARCH 2017

91

VisiConsult X-ray Systems &

Solutions GmbH – Germany

Tel: +49 451 290 286 0

Fax: +49 451 290 286 22

Email:

info@visiconsult.de

Website:

www.visiconsult.com

Commercial view

The change from film to digital technique is mainly driven

by the aim to reduce the cycle time and labour costs, while

eliminating the film consumables and chemicals. The sum of

higher throughput, less labour costs and less consumables is

a significant cost factor.

The above table provides a sample calculation of three

different setups. Assumption: 12m LSAW pipe with 15mm wall

thickness. The gate is open and the bunker is empty. Quality

standards require a 100 per cent test of the weld. 300 working

days per year. €50 per hour labour costs and €5 per 48cm film

including development.

Conclusion

The simplified example calculation shows clearly the benefit

of moving from film to a digital solution. A brand-new pipe

inspection system including bunker and doors poses an

investment of around €1,500,000. Compared to the costs for

the film and the necessary manpower the user can estimate a

return on investment (ROI) in less than two years of operation.

Beside the cost savings, the manufacturer gets many other

benefits:

Higher inspection quality

Faster feedback of identified defect inside the weld

Protection of the environment

Better reputation on the market because of better results

Access to “high-end demanding” customers, because of

improved inspection quality

Increased process safety and inspection coverage

Step

Film 6* 48cm

Digital Radiography: Off-line Digital Radiography: In-line

Move pipe in

60 sec

60 sec

60 sec

Close Gate

25 sec

25 sec

25 sec

Placing the film

120 sec

-

-

X-ray On

3 sec

3 sec

3 sec

Total exposure time

900 sec (30 shots, 30 sec)

208 sec (52 shots, 4 sec)

208 sec (52 shots, 4 sec)

Move to Position

90 sec (30 shots, 3 sec)

104 sec (52 shots, 2 sec)

104 sec (52 shots, 2 sec)

X-ray Off

3 sec

3 sec

3 sec

Open Gate

25 sec

25 sec

25 sec

Move pipe Out

60 sec

60 sec

60 sec

Move pipe to Wait position 60

60 sec

-

Cycle time

22 min

9 min

8 min

Throughput

2.5 pipes / hour

20 pipes / shift

6 pipes / hour

48 pipes / shift

7-8 pipes / hour

60 pipes / shift

Costs for consumables

Costs for labour

(1,200/40) x 20 x 5 = €3,000

2 x 8h x €50 = €800

€0

1 x 8h x €50 = €400

€0

1 x 8h x €50 = €400

Costs per shift

€3800

€400

€400

Costs per year (single shift) €1,140,000 / year

€120,000 / year

€120,000 / year

Raw costs per pipe

€190

€8.33

€6.66

Investment costs

€0

€1,500,000

€2,000,000

Return of Investment

-

1.5 years

2 years (more throughput!)

Easier archiving and delivery of inspection results

Scalable and automated setup

Reduction of required manpower

Easy certification of inspection process

Higher prices for sold products