Simon Storage - ISCo East

Instrument and Electrical Installation Specification

P & I Design Ltd

DOCUMENT NO: SI003001.INS

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 17/02/09

Tel: 00 44 (0)1642 617444

PAGE 3 OF 14

Fax: 00 44 (0)1642 616447

www.pidesign.co.uk

1

INTRODUCTION

This document details the specifications required to install instrument and electrical

equipment and associated systems at Simon Storage Ltd. ISCO East Terminal. This

document covers all aspects of industrial instrument and electrical installation work and

may contain sections that may not be relevant to every project.

2

GENERAL REQUIREMENTS

The Contractor is to supply all labour, cables, cable tray/ladder racking, equipment and

materials necessary to complete the works detailed.

2.1

General Conditions of Contract

The Contractor is required to work to the Employer’s Condition of Contract;

2.2

Requirement of Contract

To carry out works to install the instrument and electrical element of the project. Works

will be carried out while surrounding systems are under construction and care must be

taken to avoid any clash with other trades. It may be necessary to carry out some of the

works during agreed shutdowns. The Engineer will liaise closely with the Contractor to

ensure that the required systems are made available.

2.3

Safety

The Contractor is required to work to the Employer’s Safety Conditions.

Following Tender assessment, the successful Tenderer will be required to attend a meeting

and participate fully in the formulation and regular update of the final Health and Safety

Plan for the Project.

2.4

Installation

All labour, including unskilled, skilled and supervisory staff involved in the off-loading of

equipment at the site and in the complete installation, assembly and testing of all the items

included in the contract.

All materials required for the contract including earth conductors and furse clamp/fixings,

cable ladder, tray, channel, supports, cable as detailed in the schedules.

All tools and equipment, including lifting equipment, scaffolding, general plant required in

the performance of the contract and all necessary testing equipment.

The provision of all site facilities and any temporary electricity supplies.

All builders work including drilling and fixing to the civil structure, any necessary grouting

and the sealing of holes, ducts and trenches after cable installations. All fixings, nuts, bolts,