The efficiency standards in NEMA TP-1 [1] are based on certain

assumptions that may result in the selection of less-than-optimally

efficient transformers. One key assumption is that low voltage (600 V

class), dry-type (typical commercial or industrial) transformers are

loaded at 35% of their nameplate rating. For medium voltage and liq-

uid-filled transformers, the assumed loading is 50% of the nameplate

rating. Another underlying part of the economic rationale for the stand-

ard is an assumed electricity cost of six cents (US) per kWh (which is

equivalent to 62 cents per kWh in South Africa).

These assumptions could be inaccurate for industrial and commer-

cial users, who can often more accurately predict their load require-

ments and who may be paying more or less than six cents per kWh,

particularly at peak times. In fact, recommended loading for economic

sizing of a transformer is typically around 75% of nameplate; a 35%

load, if constant, means the transformer is oversized and wasting core

loss as well as being higher priced.

The operating cost of a transformer,

over its long life span, can greatly

exceed its initial price, so the

selection must include examining

the unit’s capacity and efficiency.

Copper windings

Table 1

compares a ‘standard efficiency’ 75 kVA transformer to an al-

uminium-wound TP-1 model, a copper-wound TP-1 model and a ‘pre-

mium efficiency’ copper-wound unit, at various loading levels. As

shown, choosing a more efficient, copper-wound transformer that

exceeds the minimum efficiencies of TP-1 (and Energy Star) can pay

back its price premium in as little as one year.