![Show Menu](styles/mobile-menu.png)
![Page Background](./../common/page-substrates/page0057.jpg)
55
S
eptember
2008
www.read-tpt.comT
echnology
U
pdate
›
Landis Threading Tools for All Your Tube & Pipe Threading Needs …
From 1/8" to 6" OD (3 mm to 150 mm), most materials
and thread forms.
World-Class Quality
Landis Threading is the gold standard for threading tools—die heads and
chasers for the thread forms you need—from API to NPT, straight or tapered.
We have the largest selection of threading tools available, including chasers,
die heads, spare parts, plus reamers and roller cut-off blades.
Service
You get your threading tools fast—standard, stocked chasers are
shipped within 48 hours. And most special orders within two weeks.
Technical Support
With Landis Threading, you get the most experienced threading
tool specialists in the nation—just a phone call away. Thousands
of successful applications are at hand.
Call today for more information or visit our website at
www.atilandisthreading.com360 South Church St. • Waynesboro, PA 17268-2659 USA
Phone: +1.717.762.3151 • Fax: +1.717.762.7126
E-Mail:
sales@landisthreading.comFREE CD
Ask for yours today!
Threadmaking Answers.
™
ATI Allegheny Ludlum • ATI Allvac • ATI Engineered Products • ATI Wah Chang
© 2008 ATI Engineered Products
LANT-079TubePipeAdTPT.indd 1
7/7/08 2:16:32 PM
per hour. The tubes come from production
on a roller conveyor to the preservation
line, where an oscillating lifting system
(‘walking beam system’) transfers them to a
measuring system where length and weight
are recorded. These measurements and a
serial number are stenciled into the tube.
The next step is the transfer of the tubes to
the pre-heater with a cross-chain-conveyor.
In the pre-heater, the tubes are heated up
to 40°C (104°F). The actual coating takes
place with a water-based lacquer with 2 sets
of spray guns that are arranged in a circle
to reach the complete parts surface. The
spray positions are automatically adjusted
in line with the tube diameter.
After painting, the parts pass through
a drier. After stenciling, the parts are
transferred to a packing station equipped
with a vacuum lift system where they are
collected in bundles. The number of vacuum
suction units, which package the tubes into
a hexagonal shape, depends on the length
of the tubes. The strapping of the bundle is
achieved with steel straps.
At the preservation line for Perwouralskij
the parts arrive not in single file, but are
placed in bundles by a crane on the Rösler
preservation line. In the first step, the
tubes are separated, and then weighed
and length-measured. The tubes are then
transported to a brush station. Parts not in
line with proper specifications are moved
to a ‘non-conforming’ parts station. In the
brush station, after the parts are identified,
loose dirt and rust is removed from the
tubes. After pre-heating, the parts are
transferred to the paint booth.
A light curtain signals the system not only
when a part passes through the paint booth
but also the parts size. This ensures that the
21 airless high-pressure paint guns are only
spraying material, when parts are passing
through, and that the gun placement is
adjusted in line with the parts diameter.
After drying, the tubes are transferred from
the slat conveyor to a cross-chain-conveyor,
which transfers them past a marking station
to the packing station.
As an all-round supplier, Rösler GmbH is an
international market leader in the production
of surface finishing, shot blasting machines,
painting systems and preservation lines.
In addition, the company provides process
technology for the rational surface finishing
(deburring, descaling, sand removal,
polishing, grinding) of metals and other
components.
In addition to the German plants in
Untermerzbach and Bad Staffelstein, the
Rösler Group has branches in UK, France,
Italy, The Netherlands, Belgium, Austria,
Switzerland, Spain, Romania, China, India,
Brazil, South Africa and USA.
Rösler Oberflächentechnik GmbH
–
Germany
Fax
: +49 9533 924 300
:
info@rosler.comWebsite
:
www.rosler.com
With the vacuum lift system the number of suction
units is selected according to tube length